Talfer HEPP
1x 0,5MW DIAGONAL

Client: Geppert GmbH
Scope:

Installation of EM equipment

Location: Bozen / Italy
Status: Completed

Akhalkalaki HEPP
3x 2,6MW + 1,7MW FRANCİS

Client: Geppert GmbH
Scope:

AKH 1 + AKH 2

Installation of EM equipment

Location: Akhalkalaki/ Georgia
Status: Completed

Faizabad HEPP
3x 2,5 MW Kaplan

Client: Kochendörfer Hydro
Feka Construction
Scope: Installation of HM equipment
Installation of Auxiliary equipment
Assembly and installation of portal crane
Location: Faizabad / Afghanistan
Status: Completed

Mivas HEPP
1x Francis; 1x Diagonal

Client: Geppert Austria
Scope: Installation of EM equipment
Location: Gramsh / Albania
Status: Completed

Mana Gai HEPP
2x 1,26 MW Francis

Client: AKCC Construction Afghanistan
Scope: Commissioning of EM equipment
Location: Kunar/ Afghanistan
Status: Completed

Aliçik HEPP
2x 2,7 MW Francis

Client: Kochendörfer Hydro
Scope: Installation of EM and HM equipment
Location: Rize / Turkey
Status: Completed

Saray HEPP
2x 7,5 MW Kaplan

Client: Kochendörfer Hydro
Scope: Refurbishment
Location: Of / Turkey
Satus: Completed

Duru-1 HEPP
2x 4,5 MW Pelton

Client: Merge Enerji
Scope: Exchange of nozzles
Location: Amasya / Turkey
Satus: Completed

Plant 3 HEPP
1x 4,8 MW Francis

Client: Geppert Austria
Scope: Commissioning of EM equipment
Location: Tahran / Iran
Satus: Completed

Saral HEPP
2x 2,6 MW Francis

Client: Gugler Austria
Scope: Commissioning of EM equipment
Location: Van / Turkey
Satus: Completed

Avani HEPP
2x 1,7 MW Pelton

Client: LCC ‘Energo Invest’
Scope: Installation of HM and EBOP equipment
Location: Kakheti / Georgia
Satus: Completed

Hacımercan HEPP
2x 5,6 MW Pelton

Client: WWS Austria
Scope: Installation of EM equipment
Location: Sakarya / Turkey
Satus: Completed

Gelen HEPP
2x 3,75 MW Francis

Client: Kochendörfer Hydro
Scope: Installation of EM equipment
Location: Giresun / Turkey
Status: Completed

 

Kılcan HEPP
1x Pelton

Client: Geppert Austria
Scope:
Installation of EM equipment
Location: Fetiye / Türkiye
Status: Completed

Çakırman HEPP
1x Pelton

Client: Yusaka Enerji
Scope: Runner assembly, Spare parts
Location: Erzincan / Turkey
Status: Completed

 

FPCL Thermal PP
2x 60MW + 1x 24 MW

Client: FPCL
Scope: Exchange of Generator Rotor
Location: Islamabad / Pakistan
Status: Completed

Taşköprü HEPP
2x 6,3 MW Pelton

Client: Kochendörfer Hydro
Scope: Installation of EM equipment
Assembly of Generator Rotor and Stator
Installation of HM eqipment
Location: Artvin/ Turkey
Status: Completed

Ataköy HEPP
3x 2,5 MW Francis

Client: Kochendörfer Hydro
Scope: Refurbishment
Location: Çaykara / Turkey
Status: Completed

Kızılcam HEPP
2x Francis

Client: Gugler Austria
Scope: Repair works on Hydraulic and Inlet valve
Location: Kastamonu / Turkey
Status: Completed

Büyük Karaçay HEPP
2x 1,7 MW Francis

Client: Kochendörfer Hydro
Scope: Installation of EM equipment
Location: Hatay / Turkey
Status: Completed

 

Arpacay HEPP
1x Kaplan

Client: TES + Andritz
Scope: Change of Generator bearing
Start up Turbine
Location: Nahcıvan / Armenia
Status: Completed

 

Melikom HEPP
5 + 2,5 MW Francis

Client: Melikom Elektrik Üretim A.Ş.
Scope: Installation of EM equipment
Location: Çayeli / Turkey
Status: Completed

Doğan HEPP
2x 4 MW Pelton

Client: Global Hydro Austria
Scope: Installation of EM equipment
Location: Muş / Turkey
Status: Completed

Elbiz HEPP
5+2,5 MW Francis

Client: Global Hydro Turkey
Scope: Installation of EM equipment
Location: Osmaniye / Turkey
Status: Completed